Projects · 2026–2028 pipeline

Real megawatts.
Real steel in the ground.

A look at the work currently in our books — including projects under construction, in commissioning, and active O&M contracts across Selangor, Pahang and Johor.

All Generation Engineering Technical Studies
6 PROJECTS · 312 MW PIPELINE⇅ Sort: Year
Klang Valley Peaker
IN CONSTRUCTION
GENERATION · GAS-PEAKING
Klang Valley Peaker
Open-cycle gas turbines providing reserve capacity to the central grid during peak demand.
STATE
Selangor
CAPACITY
120 MW
YEAR
2027
Kuala Selangor LSS5
FINANCIAL CLOSE
GENERATION · SOLAR PV
Kuala Selangor LSS5
Greenfield large-scale solar plant tendered under MyTNB LSS5 program.
STATE
Selangor
CAPACITY
60 MWac
YEAR
2027
Bukit Raja Substation
COMMISSIONING
ENGINEERING · SUBSTATION
Bukit Raja 132/11 kV
Turnkey substation upgrade for industrial park expansion, delivered in 11 months.
STATE
Selangor
CAPACITY
2 × 30 MVA
YEAR
2026
Pahang Grid Integration
DELIVERED
TECHNICAL · STUDY
Pahang Grid Integration
Connection study and bankability report for a third-party developer.
STATE
Pahang
CAPACITY
150 MW PV
YEAR
2026
Pasir Gudang BESS+PV
FEED STAGE
GENERATION · HYBRID
Pasir Gudang BESS+PV
Industrial estate hybrid plant combining solar and 2-hr battery storage.
STATE
Johor
CAPACITY
40 MW / 80 MWh
YEAR
2028
Port Klang BOP Retrofit
ACTIVE O&M
ENGINEERING · O&M
Port Klang BOP Retrofit
Balance-of-plant overhaul and 5-year operations & maintenance contract.
STATE
Selangor
CAPACITY
200 MW host
YEAR
2026
Footprint

Peninsular
Malaysia, end-to-end.

SELANGOR
4 sites
JOHOR
1 site
PAHANG
1 study