01 — Power · Engineering · Advisory

Generating the
next current
of Malaysian energy.

From the Klang Valley to the grid edge, we build, operate and service the generation facilities that keep Selangor — and the nation — moving.

LIVE OUTPUT
312.4 MW 49.98 Hz 0.94 PF ↑ 1.8%
EST. 2026
A new generation utility, built for the next decade.
HQ Shah Alam
312 MW
Installed generation capacity (target)
04 Sites
Operating across Peninsular Malaysia
120+ Engineers
On-ground EPC & O&M workforce
99.6 %
Availability across 2026 fleet
02 — What we do

Three pillars, one grid.

From operating the plants to designing the connections that bring them online — we cover the full lifecycle of a generation asset, from feasibility through commissioning and long-term operations.

// 01
Generation
Operation of facilities that produce electric energy — gas-fired peaking, solar IPP, and emerging hybrid sites.
// 02
Technical Activities
Professional, scientific and technical advisory across grid integration, energy storage and feasibility.
// 03
Engineering
Full-stack EPC, O&M and balance-of-plant engineering for utility and industrial clients.
03 — Aligned with MyTNB Renewable Roadmap

Built to support Malaysia's 40% renewable target by 2035.

CIDB Grade G7
Civil & mechanical contracting
ST License
Suruhanjaya Tenaga registered IPP
ISO 14001 / 45001
Environment & OH&S management